طريقة التحميل
Planning, Scheduling and Reporting Using Primavera P6 (PSR)
التقيم: 4.6
Planning Scheduling and Reporting Using Primavera P6 PSR
PSR Course

ماذا ستتعلم فى هذا الكورس

  • Primavera P6 Basic Level
  • Primavera P6 Advanced Level
  • how to prepare BL using BOQ
  • Updating & Analysis
  • Reporting Using Excel & Word & PowerPoint

متطلبات الكورس

  • No Previous experience required

محتوى كورس: Planning Scheduling and Reporting Using Primavera P6 PSR

كورس Planning Scheduling and Reporting Using Primavera P6 PSR كوبون مجانا من يوديمي

فى هذا المحتوى سنتعلم كيفية عمل جدول زمنى باستعمال برنامج البريمافيرا والاكسل بالاضافة الى عمل تحديث على الجدول الزمنى ثم عمل تقارير المتابعة المناسبة

Planning, Scheduling and Reporting Using Primavera P6 (PSR) Planning, Scheduling and Reporting Using Primavera P6 (PSR) Planning, Scheduling and Reporting Using Primavera P6 (PSR) Planning, Scheduling and Reporting Using Primavera P6 (PSR)

الكورس مكون من 6 اجزاء كالتالى

Part.01 Management, scheduling concepts (Knowledge):

Project Management

PE Responsibilities

Preparing BL Steps

Updating Steps

Schedule meth. & Tech.

Estimation Meth.

EVM in Scheduling

Cash Flow

Manpower Histogram

Part.02 Primavera P6 Basic Level:

P6 from Oracle Website

EPS & OPS & WBS

Project & Calendar

Activities

Resources

Resources Assignment

Cost Allocation

Updates

Group and Sort

Printing

Part.03 Primavera P6 Advanced Level:

Excel & Primavera

Activity ID Structure

WBS Code Structure

Resource Excel

Activities Excel

Cash Flow Excel

Manpower Histogram

Global Change

User Define

Advanced P6

Part.04 P6 Preparing Baseline:

BOQ & Documents

Activity List

Productivity Rates

Construction

Mobilization

Engineering

Procurement

Deployment Schedule

Sub-contractors

Testing & Commissioning

Part.05 Updating & Analysis:

Updates Requirements

Progress Tracking Sheet

Resources Tracking Sheet

Daily Report (Records)

Apply Actuals

Progress analysis

Expected Finish Date

Manpower Analysis

Issue Log

Part.06 Reporting:

Pie Chart

Bar Chart

Line Chart

Combo Chart

Dashboard

Performance Indicators

Narrative Report

Monthly Report

Weekly Report

Progress Presentation

 

لمن هذا الكورس؟

  • Beginners, Professionals

شاهد أيضًا:

Scroll to Top